Sector: Highway
Project: M2, Brenley Corner
Client: Interoute JV

Project Specification: Installation of 72 steel driven tube foundations for lighting columns and CCTV masts.  The tubes were installed in 10 shifts using only 1 installation team which consisted of 3 men and an excavator.

Project Duration: Work commenced on 6th February and was completed by 28th February 2010.

Design & Build: Terrawise’s partner, ScrewFast Foundations, were contracted to design a foundation to carry a single 7m lighting column.  The end result was a driven tube foundation, extremely fast to install, as well as removing the need to excavate on a steep embankment.

The steel tube was 2m high 323mm x 8mm. The piles were vibrated into the ground, and the top 850mm of the pile augured out to receive the lighting standard. The standard was then vertically aligned and grouted into position.

Client Feedback: “I have just returned from the M2 where the column foundations are being installed and so far I was very impressed with the skill of the guys installing them and the finished product.
It lives up to my expectations, if the columns fit as expected we will no doubt be using these in the future.”


Project Manager, Interoute JV

Download Terrawise Case Study: M2 Brenley Corner


To enquire about our services, please call 01270 879011 or email info@terrawise.co.uk.

To enquire about Terrawise highways services, contact a member of our team on 

01270 879 011

or email

info@terrawise.co.uk

Terrawise
eNews Updates

Subscribe to our monthly eNewsletter to receive the latest industry and company information.

CLICK HERE

Terrawise Company Profile
Download the 2011 company profile document